• Build a New Elementary School to house 1,187 students, grades PK-6: The building is to be approximately 132,636 square feet with a total co-funded cost of $48,760,111 which includes $47,954,024 non-allowance cost, $806,087 allowance cost. The District has opted not to include a storm shelter in the design of this facility. • Abatement and Demolition of three existing Elementary Schools: o Abate and demolish Lexington Central Elementary School (40,447 sq. ft.) at an estimated cost of $1,082,830; o Abate and demolish Lexington Eastern Elementary School (50,394 sq. ft.) at an estimated cost of $524,092; o Abate and demolish Lexington Western Elementary School (34,294 sq. ft.) at an estimated cost of $480,940. • Locally Funded Initiatives: As a part of this project, the District may elect to fund an increase to the building’s area to include additional classroom space, circulation area, and/or other similar scope through Locally Funded Initiatives (LFI). LFI-funded scope, if pursued, will not be known until a later date. • Locally-Administered Scope/Contracts: Locally-administered scopes of work include work scope which is outside the scope of the co-funded projects described above. The District may pursue scope(s) of work similar in nature to, and/or as required for the completion of, this project for which the Construction Manager at Risk (“CM”) may be as determined with this selection process.