Ohio State’s Transportation and Traffic Management division has three 10,000-gallon underground fuel tanks (one diesel and two gasoline) at the refueling facility. All three of these tanks have reached end of life and need to be replaced. Other associated equipment will need to be replaced including underground pumps, waste oil tank, fuel dispensers & controllers, and tank monitoring system. This project will not seek LEED certification. There are no BIM requirements on this project. LEED and BIM scores will be zeros on the A/E selection rating form. This project includes asset tagging. The Primary firm submitting for the project is required to have the expertise capable of meeting this prerequisite and is responsible to support their consultants to meet this requirement. The Asset Tagging Process Diagram, Asset Worksheet Template, and LOD Matrix can be accessed via the OSU FOD website (https://fod.osu.edu/resources) under Design Guidelines, Specifications, Standards; Specifications and Standards; Building Information Modeling (BIM).