Specifications include, but are not limited to: Contractor shall implement a replacement of the existing IdentiPass® Access Control Platform with the S2 Access Control and Alarm Monitoring (ACAM) platform. No other systems shall be accepted unless specifically approved COTA. 2. Contractor shall carefully study the Drawings and Specifications, and shall immediately report any error, unforeseen circumstances, inconsistency or omission that may be discovered. 3. Project Drawings and Specifications are complementary, and what is required by any one shall be binding as if required by both. 4. Provide all tools, equipment and manpower required for a complete and ready to operate ACAM System as described herein. 5. Contractor shall reuse existing cabling, card readers, and other field devices and rewire all devices to the new S2 platform. 6. Provide replacement network and door controllers to replace existing IdentiPass panels. 7. Contractor shall decommission obsolete IdentiPass equipment as part of the retrofit work on existing systems. 8. Coordinate with COTA IT and Security for network connectivity, wall space for equipment, anticipated down time, 120VAC power, etc.