The scope of work includes the removal and replacement of three (3) doors as identified in Exhibit A: Door A, Door B, and Door C. Work Description: 1. Removal and Replacement: o Remove existing doors and associated jambs. o Install new doors andjambs at each location. 2. Door Assembly Specifications: o Each new door shall be '/2-lite reinforced glass, consistent with the style currently in place. o Include glass lettering to match existing conditions. o Doors A and C shall retain and reuse the existing internal office notification buttons. o All doors shall be prepared for access control systems; electric strikes to be installed by others. 3. Hardware Requirements: o New lever-type locksets (key-in-knob style) to replace existing locking devices. o Include hinges, door sweeps, closers, weatherstripping, and internal kickplates with each door installation. 4. Finishes: o Paint all doors andjambs; final color to be determined by the Owner. o All finishing to match or complement existing adjacent finishes.