Construction Services: The contractor shall construct the Project pursuant to the Contract Documents and in accordance with the schedule requirements. The Design-Build contractor shall hold all subcontracts and shall be fully responsible for the means and methods of construction, progress meetings, testing and inspections, project safety, project completion within the schedule agreed upon during Project Development, compliance with all applicable laws and regulations including monitoring compliance with all LEDE, and equal employment requirements, and submitting monthly reports of these activities to CCS. CCS reserves the right to approve the contractor’s selection of subcontractors and any supplemental terms to the subcontract form. For purposes of completing the Relevant Project Experience Matrix in Section F of the Statement of Qualifications (Form F110-330), below is a list of relevant scope of work requirements for this RFQ: 1. Experience working in K-12 schools. Repair/replace existing HVAC equipment, utilizing the current HVAC infrastructure, complete with new DDC controls. 2. Mechanical systems: Heating, ventilating and air conditioning (“HVAC”) systems, control systems, domestic hot water systems, and distribution systems, etc. 3. Electrical systems: New Electrical Service, Distribution systems, Pre-construction Utility Coordination with AEP and Contribution in Aid in Construction contracts including any easement exhibits. 4. Fire Alarm: Code review, design compliance, testing and approval with Manufacturer’s Representative and Authority Having Jurisdiction. 5. Specialty systems: environmental issues if encountered. 6. Modification of Existing systems: As example only, relocation and/or modification of existing lighting systems, repair and/or replacement of existing cabinetry and interior finishes to accommodate new work, and other similar items. 7. Building Automation: Experience planning, designing and implementing solutions that deliver occupant comfort while optimizing system efficiency...