1. Flows in area of the system a. The Consultant shall provide all work to determine the current flows of future gravity lines and lift stations within the system. 2. Preliminary Engineering a. This task will include all work to develop the pump station and force main design to be used for final design. The Consultant shall prepare an advanced planning study which will include project drawings, a description of alternatives, and preliminary Engineer’s estimate. 3. Final Design and Engineering Services a. The Consultant shall show the ability to perform detailed plan design. b. Provide construction drawings per Fairfield County Utilities standards. 4. Utility Coordination a. Locate and show all existing utilities. b. Coordinate and prepare all correspondence with the utility companies during the preliminary and final design process. c. The Consultant shall provide all necessary exhibits and drawings needed for coordination with the utility companies.