Specifications include, but are not limited to: ENFORCEMENT CASE NUMBER: B201205211 DWELLING UNITS: 1 BOOK, PAGE & PARCEL: 003400020092 TOTAL FLOOR AREA: 1025 Square Feet APPROXIMATE BUILDING DIMENSIONS: 16' x32' LOT SIZE: 5321 OWASCO AVE 40 FT IRR LOT 42 J MORTEN SUB BUILDING DESCRIPTION AND ADDITIONAL REQUIREMENTS: Two story wood frame structure Barricade all of sidewalk on Owasco St for 25 lineal feet. Protection Required: Y Hand Wrecking Required: N Machine Wrecking Permitted: Y Cut and Fill Permit Required: Y Asbestos Siding Present: N 1 Remove the building and foundation to a minimum of two (2) feet below final grade. 2 Remove the yard walks and steps. 3 Back fill the basement with clean earth or rubble fill. Spread an average of six (6") inches of clean earth over the rubble fill. 4 Grade the lot to conform to existing contours, unless otherwise specified. 5 Protect all property line fencing during wrecking operations. Property line fence to remain unless otherwise specified. 6 Take necessary steps to protect the adjoining building. 7 Take necessary steps to protect the adjoining property. 8 Remove driveway and drive apron. Repair curb and sidewalk in accordance with Department of Transportation and Engineering requirements. (Separate permit, inspection and approval from DOTE is required.) 9 Remove all trash, rubbish, weeds, and brush from the entire site. (Protect all large mature trees and remove dead trees) 10 Spread seed and straw in accordannce with the standard specifications over 6" of clean earth that is free of rocks and rubbish. 11 Contractor may be required to provide a Waste Shipment Record for any asbestos the contractor has had removed under the contract. Affidavit of Original or Sub-Contractor (Labor and Material) Purchasing Form 66, shall include demolition debris disposal and name of approved demolition debris disposal site. Disposal receipts and/or proof of lawful disposal must be provided to the City upon request. 12 Contractor shall obtain NESHAP survey. Contract shall include cost for survey in bid. Contractor shall order survey and apply for demolition permit within five (5) business days of issuance of notice to proceed from the city.