a. Project Development/History b. Current Targets i. Complete installation of Replaced HVAC Systems w/Upgrades as noted for areas designated at the Ashtabula County Courthouse, utilizing the noted HVAC equipment (HVAC RTUs, etc.). 1. Note: HVAC RTU Equipment/Startup Service has been Pre-Purchased by Ashtabula County. ii. Update Electrical Power Infrastructure – by Proposer as required for coordinated HVAC Replacement Scopes of Work and existing Electrical Service (existing Feeds intended to remain in service, but be properly re-worked in area for replaced HVAC Rooftop Unit). 1. Proposer to provide Power for new & upgraded Lighting/HVAC/Controls Scopes of Work as designed/required. iii. Update designated Controls & Operational Systems 1. Proposer to review & coordinate Controls & Systems Integration, Master Programming and Owner-view Commissioning Services with County’s Master Systems Integrator (AGM Energy Services). a. Enterprise-level Equipment & Programming Services by AGM Energy Services serving as County’s Master Systems Integrator (MSI)/Temperature Control Services Provider. (AGM Energy Services to supply NOTED Equipment components, Integration and Programming Services only – see published Systems Architecture & Integration Scope Diagrams, as applicable). b. Coordinated Installation of Wiring & Hardware by Bidder/Proposer: AGM Energy Services as MSI to supply NOTED Equipment Components, labeled Temperature Controls, Integration and coordination of Install for low voltage wiring as designated; Proposer provides all mechanical-electrical installation and power – see published Systems Architecture & Integration Scope Diagrams as applicable.