1.1 The project includes surveying, appraisal, acquisition, and detailed design for two separate path connections: 1.1.1 Approximately 800 feet of six-foot-wide sidewalk is planned on the north side of Bradenton Avenue, connecting existing sidewalk on the northwest corner of Frantz to the existing sidewalk dead-end. 1.1.2 Approximately 700 feet of 11-foot-wide shared use path is planned on the south side of Bridge Park Avenue, connecting an existing ramp on the southeast corner of Dublin Center Drive/Bridge Park to the southwest corner of Sawmill/Bridge Park. Bridge Park Avenue crosswalk will be constructed by the City’s Street Maintenance Program 2026. 1.2 Meetings: One (1) Kick-off meeting (in-person), three (3) plan submittal comment disposition meetings (virtual), monthly R/W acquisition meetings (virtual, when active), plus two (2) additional in-person meetings. 1.3 A Tree survey will be necessary for any trees (over 3 caliper inches) within the project area identifying species, caliper, and health. 1.4 Impacts to trees, drainage, public utilities, private utilities, etc. shall be assessed and solutions are to be detailed and communicated throughout the design process. 1.4.1 It is the project’s intent to minimize impacts to existing utilities, but relocation of some existing structures is expected. 1.5 Consultant shall prepare an Erosion and Sediment Control Plan to meet all City of Dublin and OEPA requirements if necessary.