Specifications include, but are not limited to: 1. BACnet® Advanced Operator Workstation (B-AWS) as described below and list in the plans and specifications. This workstation shall include all the necessary software to setup, configure and program all BAS system DDC controllers. This shall include any software whose function is to set network and configuration settings, and program logic.; 2. Direct digital Controllers suitable to the applications and sequences as described herein.; 3. All final control elements, (damper actuators, valve actuators, relays etc.) as required to meet the sequence of operations and suitable to the applications as specified.; 4. Control valves as listed for BAS controlled equipment.; 5. Integration to the following third party systems: 6. Boiler(s) and flue controls (as applicable).; 7. Chiller(s) Controls (as applicable).; 8. Integral electric distribution metering (as applicable).; 9. Integration to the above systems shall include making available to the BACnet internetwork all discoverable BACnet devices and objects.; 10. Installation and wiring of all ancillary controls devices supplied by chiller and boiler manufactures as loose components to be field installed.; 11. Line voltage controls as listed and specified.; 12. Low voltage non-DDC controls as listed and specified.; 13. For attic stock the recommended spare parts as delineated in the submittals and record documents.; B. The Building Automation System (BAS) shall consist of a high-speed, peer-to-peer internetwork of ANSI/ASHRAE 135 native BACnet® DDC devices. The control system shall also incorporate input/output devices, mechanical/electrical automatic temperature control devices, enclosures, interconnecting conduit and cabling.; C. The BACnet® operating stack must be embedded directly in each individual DDC device at the media access controller level and in all operator interface and configuration applications.; D. Communication gateways, bridges, protocol translators or any other device that translates any proprietary communication protocol to BACnet® shall not be permitted as a part of the Building Automation System (BAS) provided pursuant with this specification except as required to communicate to existing building systems; E. All DDC devices shall be tested, certified, clearly stamped and listed by the BACnet® Testing Laboratories (BTL) prior to the bid date for this project. BTL product listings are available from BACnet® International (http://www.bacnetinternational.net/btl/).