0001 ROADWAY 0001 201E11000 CLEARING AND GRUBBING 1.000 LS 0002 202E20010 HEADWALL REMOVED 1.000 EACH 0003 202E23000 PAVEMENT REMOVED 1,491.000 SY 0004 202E32000 CURB REMOVED 59.000 FT 0005 202E35100 PIPE REMOVED, 24" DIAMETER AND UNDER 23.000 FT 0006 202E38000 GUARDRAIL REMOVED 463.000 FT 0007 202E42001 ANCHOR ASSEMBLY REMOVED, TYPE A, AS PER PLAN 4.000 EACH 0008 202E70110 SPECIAL - PIPE CLEANOUT, 24" AND UNDER 50.000 FT 0009 202E75000 FENCE REMOVED 121.000 FT 0010 202E98100 REMOVAL MISC.: 2.000 EACH 0011 202E98100 REMOVAL MISC.: 4.000 EACH 0012 203E10000 EXCAVATION 44.000 CY 0013 203E20000 EMBANKMENT 1,464.000 CY 0014 204E10000 SUBGRADE COMPACTION 1,899.000 SY 0015 204E45000 PROOF ROLLING 9.000 HOUR 0016 606E15050 GUARDRAIL, TYPE MGS 50.000 FT 0017 606E26150 ANCHOR ASSEMBLY, MGS TYPE E 4.000 EACH 0018 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 4.000 EACH 0019 607E98000 FENCE, MISC.: 121.000 FT 0020 623E38500 MONUMENT ASSEMBLY, TYPE C 2.000 EACH 0021 623E50000 PRECONSTRUCTION SURVEY MONUMENT VERIFICATION AND REPORT 1.000 LS 0022 623E51000 POST CONSTRUCTION SURVEY MONUMENT VERIFICATION AND REPORT 1.000 LS 0023 625E40000 SPECIAL - MAINTAIN EXISTING LIGHTING 1.000 LS 0024 625E40010 SPECIAL - REPLACEMENT OF EXISTING LIGHTING UNIT 2.000 EACH 0002 EROSION CONTROL 0025 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT 8.000 SY 0026 659E00100 SOIL ANALYSIS TEST 2.000 EACH 0027 659E00300 TOPSOIL 88.000 CY