Specifications include, but are not limited to: Contract A includes all labor and materials for the installation of approximately 325 water services and meters; and the replacement of approximately 9 waterline valves and 25 fire hydrants. The scope of the project is within the Village of West Farmington. Contract B includes all labor and materials for the construction of the new Southington 250,000 gallon elevated water storage tank; site work; and related appurtenances; installation of a spray aeration system and interior and exterior painting of the West Farmington 75,000 gallon elevated tank. The scope of the project is within Southington Township and the Village of West Farmington. Contract C includes all labor and materials for the construction of the new Braceville water pump booster station; site work; and related appurtenances. The scope of the project is within Braceville Township. Contract D includes all labor and materials for the installation of approximately 43,100 feet of new 6-inch; 8-inch; and 10-inch PVCO/FPVC waterline installed via both open-cut and horizontal directional drilling methods; approximately 60 new waterline valves and 45 new fire hydrants; 230 curb boxes and service lines; master meter enclosure; backflow preventer vault; and other related waterline appurtenances. The scope of the project is within Braceville and Southington Townships.