Description – Hazard control work will include the following: • Removal and replacement of interior windows • Addressing friction / impact surfaces of doors • Paint stabilization interior and exterior Worksite Preparation (Exterior ONLY) • Resident location – Residents will be relocated from the dwelling during work hours only for the duration of exterior project, unless exterior work is performed in conjunction with interior work, UPON CONTRACTOR APPROVAL. For the later situation, residents will be vacated for the duration of the project. • Containment and Barrier System – One layer of plastic will be laid on ground extending 10 feet beyond the perimeter of working surfaces. Plastic will be attached to the building by using duct tape. All windows within 20 feet of the working surfaces will remain shut. Edges of plastic will be slightly raised to prevent runoff of contaminated waste. • Playground equipment, Toys, and Sandboxes – All moveable items will be removed to a 20-foot distance from working surfaces. All items that are not moved will be sealed with plastic sheeting. • Security – Temporary barrier tape will be erected at a 20-foot perimeter around working surfaces. • Signs – Warning signs will be posted on the building and at a 20-foot perimeter around building. • Weather – Work will not be conducted where wind speeds are in excess of 15 mph. Work will not continue if rainy conditions exist. • Cleanup – Debris and plastic will not be left out overnight if work is not completed. All debris will remain in a secure area until project is complete. • Porches – One lead-safe entryway must be made available to residents at all times. Doors leading into the home will not be treated simultaneously.