All materials used in connection with this work write-up are to be new, of first quality and without defects - unless stated otherwise or pre-approved by Owner and Construction Specialist. 90 2 YEAR GENERAL WARRANTY Contractor shall remedy any defect due to faulty material or workmanship and pay for all damage to other work resulting therefrom, which appear within 2 year from final payment. Further, contractor shall furnish owner with all manufacturers' and suppliers' written warranties covering items furnished under this contract prior to release of the final payment. 120 FINAL CLEAN 10 After completion of all rehab, perform a final cleaning. Remove from site all construction materials, tools, debris and containment materials. Sweep clean all exterior work areas. DEMO BATHROOM 1.00 RM Demo upstairs bathroom, removing tub, shower enclosure, toilet, vanity sink, bathroom flooring. Drain and temporary remove radiator. Trade: 10 Carpentry 12 2312 SUBFLOOR--3/4" 42.00 SF Install 3/4" tongue and groove CDX plywood decking nailed 8" on center using screw shank or cement coated nails. 2457 PARTITION--2"X4" NON BEARING-FRAME IN WINDOW 15.00 SF OPENING 13 Frame a wall using 2"x4" studs 16" on center with single top and bottom plates, remove and close up bathroom window opening. 14 3810 TOWEL BAR 2.00 EA Install a 16" chrome plated steel towel bar, screwed securely to studs.