The proposed work includes: Upgrades to the collection system include the installation of approximately 1,195 linear feet of 8-inch PVC sewer main, one new 48-inch sewer manhole, one new metering manhole, and one new wastewater lagoon inlet structure. The project also involves reshaping the existing Lagoon Cell #1. Biosolids from Cell #1 will be removed and landapplied. The cell will be reshaped and enlarged, graded to accommodate a venting system, and the existing clay liner will be removed and replaced with a new 45-mil reinforced polyethylene liner installed over an 8-ounce geotextile underlayment. The scope also includes restoration of any disturbed grass areas and gravel roads. Traffic control and bypass pumping will be provided as necessary. For this project, bids will only be received and accepted via the online electronic bid service through QuestCDN