Specifications include, but are not limited to: Generally, the Work covered by the Plans and Specifications for Storm Sewer District 123 consists of the materials, labor, tools, and equipment required for the construction of storm sewer improvements and the reconstruction of intersections along 10th Street SW. The Work includes approximately 5,700 LF of storm sewer along 10th Street SW, 34th Avenue SW, 32nd Avenue SW, and 7th Street SW. The Work shall also include the removal and replacement of about 5,000 LF of curb & gutter, 9,300 SY of cement stabilized base, 3,800 Ton of asphalt pavement, and other incidentals as necessary to complete the project. Details of the construction are included in the Drawings, Project Manual, and the 2019 City of Minot Standard Specifications and Details.