Specifications include, but are not limited to: This item shall consist of all equipment, labor, and material necessary to clean and sweep all paved and concrete surfaces, which is to include gutter cleaning at the Fraine Barracks Complex location only. Contractor shall provide adequate traffic control and pedestrian control, and remove all material collected from site. This work is to be performed on a non-drill weekend.Take appropriate measures to avoid causing damage to parked cars with flying debris. Areas not accessible to motorized equipment shall be manually cleaned. This item shall consist of furnishing all materials, preparation, and application of the materials and providing all labor, equipment, tools, and incidentals necessary to complete the painting of stripes on the properly cured paved surfaces applied in accordance with these specifications. This item shall consist of all equipment, labor, and material necessary to clean and seal cracks in the paved surfaces. Contractor shall also provide adequate traffic control and pedestrian control, and clean all material removed from the cracks during the crack cleaning process.