The main concentration of work will occur on the second floor. It is anticipated that this floor will be completely gutted except for existing structural components. The new construction will contain a variety of office space along with classroom spaces as determined by the architectural program. The interior will concentrate on asbestos removal as needed, demolition and construction of new walls along with new Mechanical, Electrical, Plumbing and Fire Protection systems as needed and as coordinated with the existing systems. A complete scope will be determined during the predesign and programming phase. A full exterior restoration will include new windows, review of masonry for tuckpointing, new roof, along with new site work and landscaping.