Specifications include, but are not limited to: Contract No. 1: General Construction:Work generally consists of improvements to the existingpretreatment system, powdered activated carbon (PAC)system, finished water transfer pump station at the FargoLime Softening Water Treatment Plant (LSWTP) including: demolition; replacement of eight flocculators; replacement ofbaffle walls; replacement of sludge rake and cage assemblies;concrete basin modifications; stainless steel slide gates;permanent blowdown pump system; vertical turbine pumpremoval, refurbishing, and reinstallation; ultraviolet (UV)system; in-line mechanical mixer; ferric sulfate and sodiumhydroxide chemical feed systems; valves and actuators;process piping; miscellaneous architectural and mechanicalimprovements; and all associated appurtenances.Contract No. 2: Electrical Construction:Work generally consists of electrical construction associatedwith the improvements to the existing pretreatment system,PAC system, and finished water transfer pump station at theFargo LSWTP including: motor control center (MCC)modifications and replacement; variable frequencydrives(VFDs); control panels and control panel modifications;electrically actuated valves; electric heaters; power andconduit; and lighting system upgrades.Contract No. 3: Combined General and ElectricalConstruction:Work generally includes construction consisting of the Workdescribed under Contract 1 - General Construction andContract 2 - Electrical Construction.