Specifications include, but are not limited to: Installation should be phased and happen over the next 4 summers (or less). Allowable working period is during summer break only. Phase will be summer of 2019 to include soccer practice field, rec field, and University Ave connection. Contractor responsible for maintenance for up to ten years, including winterizing in the fall and recharging system in the spring. Contractor to submit phasing plan and locations identified on campus map (I attached a campus map on the RFP) Contractor to disregard any currently installed irrigation systems except the recently installed systems at the Football practice field , Soccer game field, and School of Medicine and Health Sciences (those systems to remain but equipment updates may be required to connect these locations with the campus wide system). UND will pay for water use Provide cost in the following manner: o Total price for complete phased installation o Capital lease to provide all financing for project and invoice UND a flat fee once a year for ten years. The exact date for payment will be negotiated between contractor and UND.