Specifications include, but are not limited to: remove and replace the upper roof at Bentson Bunker Fieldhouse. The project will begin immediately upon award and must be completed by November 1, 2020. Care must be taken to not damage irrigation piping and to protect existing turf. Provide plywood to protect the turf from ruts. All damage to the site must be 100% restored before completion. Project requirements: Remove the existing membrane. Remove and properly dispose of all materials off site. This includes removing and replacing the metal fascia if any. Existing roof insulation is 0.5” wood fiberboard and 3.5” isocyanurate. Provide and install a new .5” DensDeck Prime, or equal, mechanically attached coverboard over existing insulation and wood fiberboard with a new reinforced 60 mil low slope fully adhered EPDM. Provide and install new wood blocking and fastening plates as required. Provide and install new membrane flashing where needed. Existing roof drains to remain. Extend the rubber over the existing parapet. Provide and install new 24ga. prefinished steel on all parapet walls to bottom of capstone – standard color to be selected by Owner. Seal all joints and over cover plates with butyl caulking. No silicon caulking allowed on the project