Contract No. 1 - Base Bid: Work generally consists of bonding, mobilization, surfacing removal, base recompaction, and surfacing replacement of the corridors of Main Street, Central Ave, and 6th St NW. The improvements include erosion control, traffic control, removal of 27,733 SY of bituminous pavement, removal of 30,856 SF of millings, removal of 4,909 SF of concrete driveways, removal of 6,924 LF of curb & gutter, removal of 1,946 SF of valley gutter, removal of 9,061 SF of sidewalk, removal of 7,843 concrete pavement, removal of 3,878 concrete base (5”depth), installation of 26,809 SY of bituminous paving (7” depth), installation of 29,055 SY of aggregate base (12” depth), 29,055 of 12” subgrade preparation, installation of 7,196 SF of concrete driveways, installation of 7,352 LF of curb & gutter, installation of 5,047 SF of valley gutters, installation of 1,465 SY of concrete sidewalks, adjusting manholes, gate valve boxes, inlets, and curb stops, installation of 2 curb inlets and 2 60” manholes, crosswalk restriping, and seeding and maintenance.