Areas to be painted Common areas (walls) Hallways – 488 Mud tape and paint where 2 walls/doors will be removed going into 400 suite (East and West side of South double elevators) (walls/door removed and sheet rocked by others). South wall behind elevators will be accent wall Restrooms 499M 499W Offices (one accent wall per office) 400A, 400B, 400C, 400E, 400F, 400G 400D Mud tape paint room after North wall removal (to add glass wall) and east and west wall having soundboard and sheetrock installed 402, 404, 406, 410, 412, 416, 418, 420, 422 424 North wall of 430 continued to West hallway wall. This will be removed and sheet rocked by others – mud and tape patches prior to painting Mud, tape and paint East door that will be filled in 428, 432, 434, 436, 438, 442, 444, 446 All door frames Stairwell (477S1 & 477S), storage room (408), electrical room (430), and custodial room (440) frames to be painted on hallway side only (to door stop on jamb) 2 – Elevator doors and frames Surface Prep Repair any holes and wall cracks Remove and reinstall all outlet and switch covers Wipe all surfaces to clear any debris Materials Walls Color TBD Accent Wall Color TBD Metal Door Frames SW 7020 black fox preferred paint Benjamin Moore Command Satin Application Brush and roll Cleanup Ensure all surfaces that are not to be painted are covered properly to prevent paint from getting on them (e.g., Cabinets, countertops, appliances, etc.) All trash to be discarded appropriately.