This project will consist of the complete abatement of asbestos containing materials located at 22 S 10 th Avenue West in the City of Dickinson. The demolition of this property has been approved by the City of Dickinson City Commission. The City anticipates the following scope of work. Be advised the following list is a summary of the scope of work regarding the specific abatement areas. A full report may be obtained by contacting the City. 1. Abatement of asbestos containing materials, including but not limited to: a. Green Linoleum & Black Mastic: Kitchen Apartment 9 b. White Finishing Compound: Living Room Apartment 9 c. White Textured Surfacing: Dining Room Apartment 9 d. Brown Tile: NW Bedroom, Apartment 9 e. Gray Tile & Black Mastic: NW Bedroom Apartment 9 f. Gray Tile: Entryway Apartment 10 g. Gray Tile: Living Room Apartment 10 h. Tan Linoleum & Tan Mastic: Bathroom Apartment 10 i. Brown Tile: Front Entry Apartment 10 j. Tan Tile: Front Entry Apartment 10 k. Gray Tile: Front Entry Apartment 10 l. Off White Linoleum: Kitchen Apartment 4 m. Tan Tile: Bedroom Apartment 4 n. Black Tile: Bedroom Apartment 4 o. Gray Tile: Bedroom Apartment 4 p. Gray Tile & Black Mastic: Center Aisle Apartment 12 q. Brown Tile & Black Mastic: Bedroom Apartment 12 r. Gray Tile: Living Room Apartment 12 s. White Textured Surfacing: Apartment 12 t. Gray Tile: Living Room Apartment 13 u. Gray Tile & Black Mastic: Bathroom Apartment 13 v. White Textured Surfacing: Apartment 13 w. Black Tile: Living Room Apartment 11 x. Off White Textured Surfacing: Apartment 11 y. Black Tile: Bedroom Apartment 11 z. Tan Tile & Black Mastic: Bedroom Apartment 11 aa. Green Tile: Basement bb. Brown Tile & Black Mastic: Basement cc. Tan Tile: Basement dd. Tan Tile: Basement ee. Brown Tile: Basement ff. Brown Tile: Basement gg. Tan Insultation: Basement Pipes 2. Disposal at the approved City of Dickinson Landfill 3. Complete a Notification of Demolition and Renovation and file it with the North Dakota Department of Environmental Quality 10 days prior to beginning removal 4. All miscellaneous work required to complete the project Landfill costs shall not be included in the bid as they will be directly assessed to the property at the conclusion of the project.