The scope of work includes full designer services. At the main deck stair, an HVAC system is to be designed and installed to address persistent humidity issues affecting the lobby and stairwell across all levels. Evaluation and updates to the building’s envelope, targeting the replacement of approximately 500 square feet of curtainwall and glazing, is required. Additional improvements will include mitigation of ongoing issues, such as: fogged windows, repair or replacement of rusted materials, and elimination of any safety hazards. The focus at a second stair will be to identify and remedy leaks on the uppermost level. The project will include investigation and necessary repairs or replacements to the building’s envelope and drainage systems to prevent water intrusion. In addition to the water intrusion issues in the parking deck, leaks have also been identified in the office area. As part of this project, the office roof will undergo a comprehensive inspection to determine the source of leaks, and the scope to correct will be identified based on the outcome of the field investigation and designer recommendations. These professional design services will ensure long-term structural integrity and improved facility conditions to the Walker Parking Deck.