Specifications include, but are not limited to: Project Area 1 consists of furnishing all labor, materials, equipment, and performing all work necessary and incidental to the installation of 230 linear feet of streambank stabilization and 430 linear feet of greenway as described in the specifications and shown on the drawings. The stabilization includes grading and the installation of live stakes along Crabtree Creek. The greenway includes grading and asphalt installation to replace damaged areas of greenway on new location along with the installation of 154 linear feet of RCP. The improvements also include asphalt removal and grading to tie into existing greenway segments. The site will be revegetated with bare roots and livestakes. The contractor will be responsible for providing necessary erosion and sediment control as well as traffic control