Specifications include, but are not limited to: • Contractor will cut out a 45 ft. x 30 ft. area of cracking and separating asphalt, remove soft materials and replace and replace with new asphalt. • Repaint new asphalt to match the old. • Additionally, inspect the equipment for any hidden damages or required repairs that are in addition to the approved work on the PO that is issued. • 2u CY of B25.0C Asphalt Base and 10 CY of S9.5C Asphalt. • Paint for marking new asphalt • Project must be completed within 45 days after receiving the approved PO. • Contractor will provide one-year warranty on all workmanship and standard warranty on material as per manufacture specification. • Job site to be kept clean and safe during process and inspected by unit personnel upon completion of work. • Work to begin within 45 days of PO submittal to vendor