Specifications include, but are not limited to: • Two (2) plan sheets for the work are included below: S1.0 and S2.0. Full-size plans are available via email upon request. • A pre-construction meeting with County representatives, the structural engineer and the contractor is required prior to starting work. • Furnish the necessary supervision, labor, tools, equipment and materials to complete the required work safely and per the plans and instruction from the structural engineer. • Install necessary safety fencing and barricades at project site. “Hi-Viz” clothing / vest is required at all time inside the Solid Waste facility. • Provide for landfill and hauling fees. • Work schedule is from 8:00 am to 5:00 pm Monday – Friday. With advanced permission from the Solid Waste Manger, Greg Wiggins, work outside these hours may be permitted. • Construction must be completed by June 15, 2020.