Specifications include, but are not limited to: 1. Remove existing UPS, PowerWare model 9315-50 and its associated battery cabinet and batteries. Deliver all such removed equipment to the loading dock on ground floor of Winston Tower to be picked up by County Personnel. 2. Remove, if needed*, the maintenance bypass panel/assembly associated with the PowerWare UPS. 3. Provide and install new maintenance bypass panel/assembly if needed*. 4. Provide and install New UPS power generation device. 5. Provide and install New Battery Cabinet and associated batteries needed for the project. 6. Provide necessary dry contact alarm reporting connections and assist IAC staff with interconnecting to existing alarm reporting devices on site. 7. Provide factory trained technical personnel to perform all necessary start-up procedures as per manufacturer’s recommended procedure. Document all startup procedures and measurements during startup and provide printed copy of the documentation to Interagency Communications. 8. Provide all user manuals, technical manuals and any available documentation to Interagency Communications 9. Provide training for IAC personnel sufficient to understand the operational characteristics of the new equipment and an understanding of maintenance interfaces that offer input into proper on line operation including maintenance and troubleshooting procedures. 10 Provide and install any necessary wiring, wire connectors, wiring supports and all other parts necessary to complete the project.