Specifications include, but are not limited to: Bi-Weekly a. Grass around retention ponds requires mowing to water surface level each visit b. Edging around admin building every visit c. Spray weeds growing in sidewalk cracks and street curb each visit. d. Cut inside fence between facility fence and DOT fence each visit e. Blow grass and sand from all sidewalks, street curbing and concrete pads around entire facility each visit. Monthly a. Edge around sidewalks and roadways required monthly b. Weeding of flower beds and trimming shrubbery at administration and centralized maintenance building monthly. c. Remove weeds from entire facility fence and spray as necessary. No weeds or vines on fence. d. Spray weed killer at rocks between fore and aft south pond and rocks at spillway for both north and south pond as necessary.