Specifications include, but are not limited to: The Design/Build Team (D/B Team) will be responsible for developing drawings and details sufficient to accomplish the work described and providing the work, labor, materials and services necessary to complete construction of the project. This project scope is for the renovation of the infield area of the baseball field at J.P. Riddle Stadium. The project includes: • Mobilization • Removal and replacement of the infield sod +/- 15,000 SF • Removal, stockpiling, regrading and reinstallation of infield clay material. • Infield top dressing, if needed • Re-grading of area between infield from back stop to end of infield radius • Installation of underdrain system with cleanouts, if budget allows (tarp drain beyond infield radius and back stop trench system.) • Replacement of infield popup irrigation system and QC box behind the mound