1 SP MOBILIZATION 10 EA 2 SP REMOVE AND DISPOSE OF EXISTING ASPHALT PAVEMENT 50 SY 3 SP REMOVE AND DISPOSE OF EXISTING CONC PAVEMENT 50 SY 4 SP REMOVE AND DISPOSE OF EXISTING CONC ISLANDS, SIDEWALK, DRIVEWAYS 100 SY 5 SP REMOVE AND DISPOSE OF EXISTING CONC CURB 100 LF 6 SP REMOVE AND DISPOSE OF EXISTING MASONRY DRAINAGE STRUCTURES 10 EA 7 SP INSTALL 15” – 18” FLEXIBLE PIPE (< 4FT TRENCH DEPTH) 100 LF 8 SP INSTALL 24” – 36” FLEXIBLE PIPE (< 4FT TRENCH DEPTH) 100 LF 9 SP INSTALL 15” – 18” RIGID PIPE (< 4FT TRENCH DEPTH) 100 LF 10 SP INSTALL 24” – 36” RIGID PIPE (< 4FT TRENCH DEPTH) 100 LF 11 265 SELECT GRANULAR MATERIAL 40 CY 12 300 FOUNDATION CONDITIONING MATERIAL, MINOR STRUCTURES 25 TON 13 340 PIPE REMOVAL 40 LF 14 840 PIPE COLLARS 5 CY 15 840 PIPE PLUGS 5 CY 16 840 MASONRY DRAINAGE STRUCTURES 10 EA 17 840 FRAME WITH GRATE, STD 840.** 10 EA 18 840 FRAME WITH GRATE & HOOD, STD 840.03 10 EA 19 840 FRAME WITH COVER, STD 840.54 2 EA 20 846 8” X 18” CONCRETE CURB 100 LF 21 846 2’-6” CONCRETE CURB & GUTTER (500 LF OR LESS) 250 LF