Specifications include, but are not limited to: 3.2.1 Provide a one-line diagram, developed in AutoCAD, of the Conventions Centers electrical distribution system, beginning at the utility service entrance and continuing thru the system to include all components as listed in the System Components and Planned Service Interval Schedule. Contents of the one-line diagram will include equipment identification and ratings, protective device ANSI identifiers, and bus/branch identification. Components such as transformers, protective replays, fuses, switches, current transformers, potential transformers, capacitors, reactors, bus way, and cables will be shown on the diagram. Buses will be numbered sequentially within voltage levels for ease of reference throughout the study. 3.2.2 Hazard Risk (Arc Flash) Analysis, Device Coordination Analysis, and Short Circuit Analysis: A Hazard/Risk Analysis and Short Circuit Coordination Study will be performed on the facilities electrical distribution system beginning at the utility service entrance and continuing thru the system to include all components as listed in the System Components and Planned Service Interval Schedule.