Project Scope: • Site prep: Site is already graded flat but would need a base of gravel appropriate as an underlayment for the foundation described in the attached foundation plan. Access to the site from the existing gate is 40 ft and would require approximately 5 cu. yd. of gravel to provide a 12 ft. wide access drive for construction vehicles. • Construction of concrete pad: including stubs for plumbing and electrical as outlined in engineering plans attached. Town of Boone building inspector would require inspection of concrete forms in place pre-pouring. Post pouring inspection is also required. The type of concrete required is outlined in the foundation plan attached. • Assembly of greenhouse kit purchased from Atlas Greenhouse following details outlined in the attached engineered plan. • Outside polycarbonate layer to be attached in accordance with provided engineered drawing. • Attachment of all fixtures purchased with greenhouse including, 1 fan, 2 vents, 1 door, 1 heater and 1 controller. Locations are shown on engineered plan. • Electrical wiring: 1. National Electric Codes will be adhered to throughout the greenhouse...