The following is a general description of the work required. This description is not intended to be all-inclusive. A more detailed description of the work requirements will be negotiated with the successful firm. A. Field Evaluation: Evaluate existing wastewater lift station and collection system flow monitoring data over the last ten (10) years, as well as current GIS data sets. Where critical data gaps are identified, relevant data collection may be required, such as additional sanitary sewer flow monitoring, collecting survey grade manhole rim and invert elevations, and providing public notification for field activities. B. Modeling: Develop a hydraulic model which incorporates the survey and GIS data, along with flow monitoring results into a system-wide model and make recommendations for future system improvements to serve build-out within the SRU wastewater collection system. Tasks include but are not limited to: • data collection & analysis • model construction • model flow development • model calibration/validation C. Capital Improvements Planning: Recommend system improvements to address capacity issues. Develop a Capital Improvement Plan including planning-level cost estimates for all identified projects phased to meet projected development over the next 30-years. D. Collection System Dashboard: Development of a dashboard to allow internal users the ability to customize data analytics to meet specific needs, using Microsoft Power BI, Capital Predictor, or a similar software platform. E. Deliverables: Summarize the existing system evaluation, data analyses, planning processes, model development and recommended capital improvements in a concise report. In addition, SRU will require an appropriate level of functionality to adequately operate and maintain the newly developed sewer model in-house, as needed.