The proposed project generally includes: headworks replacement with a mechanized screen, and bypass channel with manual bar rack; replacement of aeration basin equipment and improvements; chlorine contact basin improvements including mud valves and chemical feed piping; chemical feed equipment and building improvements; converting the dechlorination system from sulfur dioxide gas to liquid sodium bisulfite; RAS/WAS pump station improvements, sludge holding tank equipment replacement (alternate bid item); effluent pump station improvements including vertical turbine pumps, valves, piping, and controls; operations building lighting and roof replacement (alternate bid Item); new generator and automatic transfer switch; and associated electrical, piping, paving, and other appurtenances