To replace current 160-ton chiller with like or same capacity chiller with following: 1. Adding new rental tap connections with proper valving 2. Replacing current butterfly valves with new 3. Re-use current concrete pads, any additional concrete is in contract 4. Provide all new closed cell elastomeric insulation with aluminum jacket covering 5. Replace heat tracer line with new 6. Connect and establish controls to existing Johnson Controls Facility Explorer with graphics 7. Replace any and all pressure and temperature gauges with new 8. All refrigerate removed from current chiller and once removed, remain on site for demo by WPCC 9. Provide louvered panels on new chiller 10. All Electrical work is in contract 11. Provide warranty information and annual service PM quote for chiller (that is in combination/coordination with the warranty)