0001 0000100000-N 800 MOBILIZATION Lump Sum L.S. 0002 634 CY 0106000000-E 230 BORROW EXCAVATION 0003 381 TON 1220000000-E 545 INCIDENTAL STONE BASE 0004 30.89 SMI 1245000000-E SP SHOULDER RECONSTRUCTION 0005 262 TON 1260000000-E SP AGGREGATE SHOULDER BORROW 0006 13,590 SY 1297000000-E 607 MILLING ASPHALT PAVEMENT, ***" DEPTH MILLING ASPHALT PAVEMENT, ***"DEPTH (1 1/2") 0007 6,977 SY 1330000000-E 607 INCIDENTAL MILLING 0008 22,130 TON 1519000000-E 610 ASPHALT CONC SURFACE COURSE, TYPE S9.5B 0009 1,461 TON 1575000000-E 620 ASPHALT BINDER FOR PLANT MIX 0010 442 TON 1704000000-E SP PATCHING EXISTING PAVEMENT 0011 141,267 SY 1775000000-E 660 ASPHALT SURFACE TREATMENT, MAT COAT, #78M STONE 0012 76,647 SY 1775500000-E 660 ASPHALT SURFACE TREATMENT, MAT COAT, #*** STONE ASPHALT SURFACE TREATMENT, MAT COAT, #67 STONE 0013 75,743 GAL 1838000000-E 660 EMULSION FOR ASPHALT SURFACE TREATMENT 0014 2 EA 2845000000-N 858 ADJUSTMENT OF METER BOXES OR VALVE BOXES 0015 549 SF 4413000000-E SP WORK ZONE ADVANCE/GENERAL WARNING SIGNING 0016 4457000000-N SP TEMPORARY TRAFFIC CONTROL Lump Sum