Specifications include, but are not limited to: 1. The project generally consists of a new detention center totaling approximately 109,500 SF. The project is mixed-construction consisting of both Type II-B and Type I-B construction, Group I-3 and Group B occupancy. Construction includes concrete and brick veneer masonry construction with steel framing, interior CMU partitions, TPO roofing, architectural casework, food service equipment, detention equipment, security electronics, and finishes typically associated with a new detention center. The Project includes a kitchen, laundry, vehicle sally port, intake/ booking and steel detention cells. Sitework includes stormwater management, sidewalks, parking lots, grading, and fencing/ gates. Mechanical work includes ductwork, plumbing, sprinkler system, smoke control system, controls, and roof top units. Electrical work includes panelboards, lighting fixtures, fire alarm, emergency generator, power, technology wiring and infrastructure; and security systems (cameras, intercoms, duress, door controls, and touchscreens). 2. Construction is anticipated to begin by January 2023. 3. Substantial Completion is anticipated to be no later than August 2024.