Contractor shall complete all work as specified or indicated in the contract documents. Project is located within the city limits of Fayetteville, NC and consists of installation of approximately 1,300 feet of drainage piping and 400 feet of box culvert, beginning at the intersection of Daisy Lane/Webster Avenue and continuing across private lots, crossing Swann Street, private properties, then running along Tryon Drive. There are two Tryon Drive crossings and one additional Swann Street crossing. Also included is asbestos cement waterline abandonment and replacement with approximately 2,000 feet of 8” PC350 ductile iron waterline. The project also involves installation of storm inlets, manholes, sanitary sewer, endwalls and wingwalls, grading, rip rap, paving, curbing, driveways, erosion control, traffic control, etc.