The Contractor shall furnish all labor, equipment, materials, transportation, and incidentals necessary to complete interior repairs at Town Hall to restore the facility to its pre-disaster design, function, and capacity (in-kind) and within the existing footprint. Work includes removal and replacement of commercial carpet and drywall and painting throughout multiple office spaces, with embedded mitigation for installation of vinyl plank flooring. All work must comply with Federal, State, and Local building codes, FEMA Public Assistance requirements, and another other applicable codes and standards. SITE 01 – TOWN HALL INTERIOR Accounting Office Replace 116.6 SF Commercial Carpet with Vinyl Plank Flooring Replace 173.32 SF Drywall (43.33 FT x 4 FT) Assistant Manager Office Replace 221.55 SF Commercial Carpet with Vinyl Plank Flooring Replace 241.32 SF Drywall (60.33 FT x 4 FT) Board Room Replace 928 SF Commercial Carpet with Vinyl Plank Flooring Replace 488 SF Drywall (122 FT x 4 FT) Conference Room Replace 345 SF Commercial Carpet with Vinyl Plank Flooring Replace 354 SF Drywall (88.5 FT x 4 FT) Finance Director Office Replace 163.24 SF Commercial Carpet with Vinyl Plank Flooring Replace 173.32 SF Drywall (51.33 FT x 4 FT) Human Resources #1 Replace 93.28 SF Commercial Carpet with Vinyl Plank Flooring Replace 157.32 SF Drywall (39.33 FT x 4 FT) Human Resources #2 Replace 104.125 SF Commercial Carpet with Vinyl Plank Flooring Replace 166 SF Drywall (41.5 FT x 4 FT) Planning and Zoning Office Replace 110 SF Commercial Carpet with Vinyl Plank Flooring Replace 168 SF Drywall (42 FT x 4 FT) Project Manager Office Replace 220 SF Commercial Carpet with Vinyl Plank Flooring Replace 248 SF Drywall (62 FT x 4 FT) Senior Administrator Office Replace 120.27 SF Commercial Carpet with Vinyl Plank Flooring