The work entails drilling, epoxy and lag bolting the speed cushions to the pavement. The City has done their due diligence and are unaware of any subsurface conditions that would necessitate a change to the normal installation process (see Attachment D). All of the materials required to complete the installation described above will be provided by the City, but the Contractor shall be responsible for picking up the materials at the Public Works Compound, Building E. The anticipated equipment required for the installation includes: • Vehicles to transport the materials from PW to the job site; • Pick-up trucks to haul the actual tools required • Compressed air to clean area and drill holes • Portable drills (chargeable) • Regular electric drills • Gas powered generators to power the electric drills • Drill bits (to be defined with selected Contractor) • Caulking guns