Inspection and Testing Requirements: 1. Perform an annual test on Smoke Vents per NFPA 204: We currently have 211 Smoke Vents. 2. Doors shall be activated by pulling on manual release. Latches should immediately release smoothly and open moving through its designed travel. Doors should open fully without assistance or interruption which would indicate a faulty piston, sticking weather seal, or corroded bearings. 3. With doors open, inspect the restraining cable system. Cabling should have ample tension and no frays. Observation shall be made of the whip and travel path of cable, noting any possible obstruction that would delay release of the doors. Any interference shall be corrected by removing obstruction and noted immediately. 4. All operating levers, latches, hinges and weather sealed surfaces shall be examined to determine conditions, such as deterioration and accumulation of foreign materials. An operational test shall be performed after removal or correction of any issues. 5. Inspect the fusible link to determine the date and temperature rating stamped on each fusible link. Fusible links have a life expectancy of 5 years. If during the inspection the fusible link is 5 years or older, it must be replaced with a new fusible link with the identical temperature rating...