The scope of work includes advance planning (AP), design, and construction phases. The AP phase includes working with University staff to identify projects needs, analysis of potential SCM(s), and recommendations. Analysis will include evaluating location, size, type, and constructability. All system information generated as part of this project will be delivered to the University in an ESRI Stormwater Utility Network database as well as traditional engineering/construction formats. The project will incorporate development of educational and aesthetic aspects that include native plant centric landscape. The Designer will conduct a design charette with University stakeholders during the AP phase. The Designer will identify and generate the necessary documentation to obtain a City of Charlotte Stormwater Management permit, and all other regulatory permits and approvals. The comprehensive nature of this project and permitting needs will warrant the involvement of numerous expertise. In addition to stormwater engineers, this project will require at a minimum the expertise of surveyors, geotechnical engineers, environmental scientists, and architects. During the Design Phase, the Designer shall provide combined SD/DD & CD documents and estimated construction costs for University review. The Designer will also identify and obtain all permits required to complete construction. Designer shall also facilitate Bidding. The Designer will provide Construction Phase services that include contract accuracy, construction administration, inspection services, production of record drawings, and any permitting activities...