Cleveland Ave: Approx. 93 LF of 24" HDPE, approx. 203 LF 18" HDPE, several drop inlets, one OTCB, one FES, relocation of water and sewer services, remove and replace portions of concrete driveways, roadway resurfacing, and asphalt curb installation. Country Club Dr: Approx. 415 LF of 15" HDPE, several junction boxes, one drop inlet, one catch basin, lights grading around drop inlet, C&G removal and replacement, and asphalt removal and replacement. Townsend Ave: Tree removal (2), sidewalk removal and replacement, removal portion of existing storm system, fill and plug portion of existing storm system, remove 18" RCP and replace with approx. 52 LF of 24" HDPE, one junction box, one headwall, drainage channel (2' bottom with 3:1 side slopes), and relocation of tv satellite dish.