East Durham Water, Sewer, and Stormwater Replacement Phase 1A: The Base Bid consists of the installation of approximately 3,200 linear feet of 8-inch to 16-inch sanitary sewer replacement, replacement and reconnection of existing sanitary sewer services, installation of approximately 2,100 linear feet of 6-inch to 12-inch DIP waterline, replacement of existing domestic and fire services, installation of approximately 260 linear feet of 36-inch to 42- inch stormwater, sanitary sewer / stormwater structures, connections to existing piping, valve assemblies, traffic control, approximately 150 LF of 8-inch CIPP installation, miscellaneous surface restoration and all associated appurtenances, as described in the Specifications and shown on the Drawings. The Bid Alternate consists of the installation approximately 230 LF of 8” sanitary sewer as shown in Sanitary Sewer Connection Details Number 2 and 3.