This project involves the replacement of the existing water supply and sanitary collection systems along Ray Street from Brooks Avenue to approximately 525 feet east of its intersection with Madison Avenue. Work includes: the abandonment and/or removal of the existing water supply system as indicated on the drawings; the installation of approximately 1,658 linear feet of new 6” diameter water main; installation of (33) ¾” diameter water service lines (including meter setters and meter boxes); the installation of (3) fire hydrant assemblies; the installation of (3) 6” gate valves; the installation of (1) 8”x6” tapping sleeve and valve; the abandonment and/or removal of the existing sanitary sewer collection system as indicated on the plans; the installation of approximately 1,660 linear feet of new 8” diameter sanitary sewer main; the installation of approximately 485 linear feet of sanitary sewer service laterals; the installation of 31 sanitary service cleanouts; and the installation of 6 new sanitary sewer manholes. Work includes all pavement patching, pavement milling and overlay, select material, traffic control, erosion & sediment control, concrete work, grading, seeding, mulching, landscaping, bypass pumping, and any other incidental work required to complete the work and to return the area to previously existing conditions. The foregoing description shall not be construed as a complete description of all work required.