• The demolition process will include the removal of ALL debris and building materials from the demolition area (i.e., all rocks, masonry, and wood/metal scraps). The demolition area shall be raked clear/smooth of ALL debris before seeding. • The Contractor shall backfill and compact all excavated areas with sand-clay and dress off and fill in all low spots with topsoil in order to provide positive drainage within the limits of the work area and shall grade, reseed, and straw the demolition area and any other areas disturbed during completion of the work. • Reseeding is to be done with Kentucky Fescue grass seed. (The result of this effort will create an area that can easily be maintained with standard residential yard maintenance equipment.) • The demolition process shall include dust control. This process shall be accomplished with the use of at least a 1” hose with a nozzle producing a fog spray pattern sufficient to maintain adequate dust control to the satisfaction of the Central Services Director or designee. NOTE: The Demolition Contractor shall remove any trees damaged during the demolition process. • The contractor shall be required to install and maintain temporary sedimentation and erosion control measures to prevent sediment from leaving the site and entering the storm drainage system. This would primarily consist of block and gravel curb inlet protection. Bad weather days will be considered but shall be coordinated with the Central Services Department Director. • The Contractor awarded the bid shall be responsible for all equipment, labor, and materials needed to demolish the property and the hauling of materials to the disposal site. If present, the contractor will not be allowed to stage equipment or cross a box culvert located on or immediately adjacent to the property. Disposal of materials shall be done in accordance with all Federal, State, and Local laws and shall be at a State approved landfill. • Copies of the waste manifest bills from the landfill shall be supplied at the time you submit your bill for payment of the demolition. Payment will not be made until such time as these manifests are provided to the city by the Contractor.