A. Demolition - Complete removal of the existing pavilion structure, including all concrete footings, roofing, and related materials - Proper disposal of debris per local, state, and FEMA debris removal guidelines - Coordination with Town staff to ensure protection of adjacent park infrastructure B. Pavilion Construction - Build new structure per attached Drye-McGlamery Engineering plans (Sheets S-0 to S-5), meeting all applicable 2018 NC Building Code and ASCE 7-10 requirements - Pavilion includes: - Concrete slab-on-grade with footings per foundation plan - Pre-fabricated roof trusses and structural wood framing - Metal roofing and T-111 stained ceiling - LP SmartSide board-and-batten siding and trim - All structural connectors per manufacturer specs (Simpson Strong-Tie or approved equivalent) C. Electrical Work - Trench and run conduit from new power pole (installed by Waynesville Electric Dept.) to pavilion (~60 ft.) - Install eight (8) recessed can lights in the ceiling - Coordinate final inspection with Town and utility staff D. Grading and Site Restoration - Contractor to provide pre-construction grading as needed - Contractor to seed and straw all disturbed areas after construction