1. There is no pre-bid meeting included in this scope. 2. PRE-CONSTRUCTION MEETING: Prior to the Notice to Proceed, the awarded Contractor must attend a pre-construction meeting with City representatives to review schedule and details of the project. Schedule to be approved prior to commencing work. 3. Remove all existing shingles and felt down to the decking. 4. Install new synthetic felt. 5. Install metal drip edge. 6. Install new StormGuard waterproof underlayment, or approved equal, per manufacturer’s installation instructions and guides. Use underlayment on the bottom course and in the roof valleys, in place of standard felt. 7. Install new 30-year asphalt architectural brown shingles and nails (limited lifetime warranty, wind rated, and fungal/algae-resistant). a. Shingles to be made by Certainteed, GAF, Owens Corning, or an approved equivalent. b. Provide manufacturer’s warranty. c. Final shingle color to be approved by City. 8. Replace all facias (2x6) with ground-contact pressure-treated lumber (non-painted). a. All facias must be screwed in, not nailed. 9. Clean up and haul away all job-related debris. Use magnet to collect roofing nails on ground. 10. Schedule coordination with shelter rental schedules may be necessary. 11. Safety fencing may be required if work each day is not secured or completed to keep others from accessing the work area.